Roof refurbishment
Strip and re-sheet, overroofing and overcladding on buildings that cannot close — phased, sheeted up as we go, and worked at night or at weekends where the programme demands it.
Refurbishment on occupied buildings
Refurbishment is not new build with an older roof. There is stock underneath, or staff, or a railway. The roof you open in the morning has to be watertight by the time you come down, whatever the forecast says, and the survey has to tell you what is under the covering before you commit to a price.
So we survey first — always. We look at the deck, the purlins, the fixings and the gutters, we tell you what we found, and we phase the work into bays that can be opened and closed inside a shift. Where the existing roof can stay, overroofing avoids the strip entirely and keeps the building dry throughout.
- Strip and re-sheet
- Overroofing
- Overcladding
- Cut-edge and gutter works